NEUHARDENBERG, GERMANY
Neuhardenberg, Germany
The 145 MWp ground-mounted solar power plant was installed on the 240-hectare site of a former military airfield in Brandenburg. ENERPARC owns 80 MWp of the plant and was responsible for the EPC, O&M, and financing. Following a six-week construction phase, the plant was commissioned in the fall of 2012.
- 145 MWp ground-mounted PV plant
- Completed in September 2012
- EPC and investor: ENERPARC AG
- 6-week construction period