NEUHARDENBERG, GERMANY

Neuhardenberg, Germany

The 145 MWp ground-mounted solar power plant was installed on the 240-hectare site of a former military airfield in Brandenburg. ENERPARC owns 80 MWp of the plant and was responsible for the EPC, O&M, and financing. Following a six-week construction phase, the plant was commissioned in the fall of 2012.

  • 145 MWp ground-mounted PV plant
  • Completed in September 2012
  • EPC and investor: ENERPARC AG
  • 6-week construction period