ENERPARC developed, built and operates the photovoltaic plant in Wasbek in Schleswig-Holstein with an output of 40.7 MWp on an area of around 95 hectares in nine construction phases between 2020 and 2023. The project is special because the solar power flows directly into the Deutsche Bahn grid - without burdening the public power supply network.
- Own transformer station
- 40.7 MWp ground-mounted PV system
- Completed in April 2023
- EPC and O&M ENERPARC AG